<p>Perth, WA (Australia)</p>
The facility will contribute to landfill reduction by processing 400,000 tonnes of waste every year, equivalent to one quarter of Perth’s post-recycling rubbish. This processing will reduce carbon dioxide emissions by more than 400,000 tonnes annually.
The facility will also generate and export 36MW of green electricity to the local grid every year, sufficient to power more than 50,000 households.
GENERAL INFORMATION
- Location:
- Kwinana Industrial Area 40km south of Perth, WA
- Contract Type:
- ACCIONA will engineer, procure and construct the facility, with the 36-month construction period commencing in October.
- Completion date:
- Operations and maintenance of the facility will commence by the end of 2021
- Operation and Maintenance:
- Veolia will operate and maintain the facility under a 25-year agreement.